Slow down AI

Learn / Why data centers matter

Explainer

The race is physical.

Frontier AI is trained in buildings the size of several football fields, full of specialised chips, drawing as much electricity as a mid-sized city. Most of them in the US are rented or owned by a handful of AI companies. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

International Energy Agency · Energy and AI · April 2025: a 100 MW data centre draws as much as 100,000 households ↗
Data center, aerial

That physicality is the point. You can’t hide a gigawatt. Where a company builds, what it draws from the grid, and who approves it are all things a public can see, question, and slow down. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris. See how soon is soon? for why the build-out is accelerating, and compute in the glossary.

What you can ask locally

Who pays for the new transmission lines? What happens to residential rates? Was there a public hearing? Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore. Lorem ipsum dolor sit amet.

Tell a repLearn